Testing & Commissioning

Our team is experienced with all types of Testing procedures. Factory Acceptance Test (FAT) is organised for each project where complexity and integration level require that all interconnections to be tested abroad. Site Acceptance test (SAT) is performed by our engineers for all systems before handed to the client. Unit Tests (UT) are performed for each and every items before installation, in our laboratory.

Before handing over any system to the client, the equipment will be powered up and tested by our technical team for a minimum periode of one week.